Search Results
S053 Semi Trailer Deck Steel Checked Floor Top And Bottom Welding Station Observation (Part I)
S054 Semi Trailer Deck Steel Checked Floor Top And Bottom Welding Station Observation (Part II)
S055 Semi Trailer Deck Steel Checked Floor Top And Bottom Welding Station Observation (Part III)
S067 Semi Trailer Air Reserve Tank Assembling Before Installation Station Observation (Part I)
S060 Semi Trailer Hydraulic Steel High Pressure Pipe Installation Station Observation
S065 Semi Trailer Breaking & Electrical Line Settlement Installation Station Observation (Part II)
S051 Semi Trailer Frame Body Welding After Turning The Surface Top Platform Observation (Part VI)
S059 Semi Trailer Side Guard Production Installation Station Observation (Part II)
S061 Semi Trailer Landing Gear Legs On The Main Beam Installation Station Observation
S007 (Normal) Cold Straightening Semi Trailer Main Beam After The Submerged Arc Welding Observation
S077 Part III Submerged Arc Welding Semi Trailer Main Beam Top Bottom Flange And Web Observation
S066 Semi Trailer Breaking & Electrical Line Settlement Installation Station Observation (Part III)